PROJECT COST MANAGEMENT AT THE DESIGN AND CONSTRUCTION STAGE
https://doi.org/10.17747/2078-8886-2015-1-1
Abstract
At this moment there are a lot of economic literature and methodical recommendations, including IAEA standards, where question of investment projects efficiency valuation are enough worked out, with conception description of how to take into account loans and financial leasing costs according to alternative methods being assumed. Nonetheless, it’s failed to address the issue to the capitalized costs informational block-schedule and methodical approach, allowing to module the loans and the financial leasing accounting parameters, with the capitalized costs being assumed on the design and the construction stage of the science-intensive projects (aircraft manufacturing, nuclear power engineering).
Also on the design and the construction stage it weren’t worked out the methodical recommendations, allowing to be assessed the influence of the capitalized costs and incurring losses by the tax expense from continuing operation calculation from the point of view of accounting standards and tax legislation on net present value and financial stability of project.
In this way the task to work out the methodical approaches and recommendations, allowing to model the loans and the financial leasing accounting parameters, and to carry out the assessment of the capitalized costs influence on the net present value and the financial stability of the project are current importance task. In the article authors stipulate that capitalized costs of the loans and the financial leasing and also the capitalized amortization & depreciation are the effective instrument of financial stability and net present value project managing.
About the Authors
M. A. FedotovaRussian Federation
Doctor of Economics, Professor, Vice-Rector of "Financial University under the Government of the Russian Federation"
A. S. Maltsev
Russian Federation
External Ph.D. student at the Department “Mathematical Methods for Economic Analysis” of Federal State Budgetary Educational Institution of Higher Professional Education “Lomonosov Moscow State University”, chief specialist of OJSC “All-Russian Scientific Research Institute for Nuclear Power Plant Operation”. Area of expertise: evaluation, corporate finance, value engineering.
T. V. Tazihina
Russian Federation
Ph.D. in Economics, Associate Professor, Professor of the Department “Evaluation and Administration of Property” of Federal State Budgetary Educational Institution of Higher Professional Education “Financial University under the Government of the Russian Federation”. Area of expertise: evaluation, corporate finance, value engineering.
References
1. Методические рекомендации по оценке эффективности инвестиционных проектов (вторая редакция) (1999), утвержденные Министерством экономики РФ, Министерством финансов РФ, Государственным комитетом РФ по строительной, архитектурной и жилищной политике от 21.06.1999 № ВК 477. 547 с.
2. Волков И. М., Грачева М. В. (2004) Проектный анализ. М.: Инфра-М. 493 с.
3. Виленский П. Л., Ливщиц В. Н., Смоляк С. А. (2001) Оценка эффективности инвестиционных проектов, теория и практика. М.: Дело. 832 с.
4. Киреев В. И. (2004) Численные методы в примерах и задачах. М.: Высшая школа. 479 с.
5. Горбатова Л. В. (2006) Международные стандарты финансовой отчетности. М.: Волтерс Клувер. 207 с.
6. Грязнова А. Г., Федотова М. А. (2008) Оценка бизнеса. 2‑е изд. М.: Финансы и статистика. 736 с.
7. Мальцев А. С., Рутгайзер В. М. (2011) Традиционная теория и теория Модильяни–Миллера структуры капитала компании // Имущественные отношения в РФ. № 9. С. 50–70.
8. Бригхем Ю., Гапенски Л. (2001) Финансовый менеджмент. СПб.: Экономическая школа. Т. 1. 497 с.
9. Брейли Р., Майерс С. (2004) Принципы корпоративных финансов. М.: ЗАО «Олимп-Бизнес». 976 с.
10. Коупленд Т., Колер Т., Мурин Д. (2002) Стоимость компаний. Оценка и управление. М.: ЗАО «Олимп-Бизнес». 565 с.
11. Крушвиц Л., Шеффер Д., Шваке М. (2001) Финансирование и инвестиции. СПб.: Питер. 297 с.
12. Мэтьюз Д., Куртис Д. (2001) Численные методы. М.; СПб.; Киев: ИД «Вильямс». 713 с.
13. Ли Ч. Ф., Финнерти Дж. И. (2000) Финансы корпораций: теория, методы и практика. М.: Инфра-М. 685 с.
14. Cost estimation guidelines for generation IV nuclear energy systems (2007) / The Economic Modeling Working Group of the Generation IV International Forum. Revision 4.2. [S. l.]. 181 р.
15. Economic Evaluation of Bids for Nuclear Power Plants. (2000). Technical reports series № 396 / International Atomic Energy Agency (IAEA). Vienna. 233 р.
Review
For citations:
Fedotova M.A., Maltsev A.S., Tazihina T.V. PROJECT COST MANAGEMENT AT THE DESIGN AND CONSTRUCTION STAGE. Strategic decisions and risk management. 2015;(1):68-89. (In Russ.) https://doi.org/10.17747/2078-8886-2015-1-1